# Selective Parity Week — 2026-03-23
## Context
Atlas now has a documented competitive strategy:
- keep MVP frozen
- preserve trust as the primary moat
- selectively close the most visible comparison gaps against `Mole`, `Tencent Lemon Cleaner`, and `Pearcleaner`
This week plan turns that strategy into the next development-ready execution window.
Related docs:
- [Open-Source-Competitor-Research-2026-03-21.md](./Open-Source-Competitor-Research-2026-03-21.md)
- [Competitive-Strategy-Plan-2026-03-21.md](./Competitive-Strategy-Plan-2026-03-21.md)
- [ROADMAP.md](../ROADMAP.md)
## Planned Window
- `2026-03-23` to `2026-03-27`
## Goal
Prepare Atlas's next coding phase with a strict mainline order so development starts on the highest-pressure competitive surfaces first and does not drift into premature release work:
- `EPIC-A` `Apps` evidence execution against `Pearcleaner` and `Lemon`
- `EPIC-B` `Smart Clean` safe coverage expansion against `Mole` and `Lemon`
- `EPIC-C` `Recovery` payload hardening
- `EPIC-D` release readiness only after the product-path epics stabilize
## Scope
Stay inside frozen MVP:
- `Overview`
- `Smart Clean`
- `Apps`
- `History`
- `Recovery`
- `Permissions`
- `Settings`
Do not expand into:
- `Storage treemap`
- `Menu Bar`
- `Automation`
- duplicate-file or similar-photo cleanup as new Atlas modules
- privacy-cleaning as a new standalone module
## Sequencing Rule
Execute the next mainline epics in this order only:
1. `EPIC-A` Apps Evidence Execution
2. `EPIC-B` Smart Clean Safe Coverage Expansion
3. `EPIC-C` Recovery Payload Hardening
4. `EPIC-D` Release Readiness
Why this order:
- the clearest competitive comparison pressure is already concentrated in `Apps` and `Smart Clean`
- the release chain is mostly working in pre-signing form
- public release remains blocked by missing signing materials, not by packaging mechanics
## Must Deliver
- A concrete fixture-backed baseline for `EPIC-A` uninstall evidence work
- One implementation-ready plan for the first `Apps` evidence coding slice
- A bounded target list for the next `Smart Clean` safe roots after `Apps`
- Updated acceptance criteria for `Apps`, `Smart Clean`, and `Recovery`
- Updated release-facing beta checklist so release work stays downstream of the product-path epics
## Backlog Mapping
- `ATL-251` Define the fixture app baseline for mainstream and developer-heavy uninstall scenarios
- `ATL-252` Make `Apps` preview, completion, and history render the same uninstall evidence model end to end
- `ATL-253` Define the restore-triggered app-footprint refresh policy and stale-evidence behavior after recovery
- `ATL-254` Script the manual acceptance flow for uninstall evidence, restore, and post-restore refresh verification
- `ATL-256` Define the next batch of high-confidence safe roots outside app containers and freeze the no-go boundaries
- `ATL-257` Stabilize `review-only` vs `executable` boundary metadata and UI cues across scan, review, execute, completion, and history
- `ATL-261` Freeze the recovery payload schema, versioning rules, and compatibility contract
- `ATL-266` Make `full-acceptance` a routine gate on the candidate build instead of a one-off release exercise
## Day Plan
- `Day 1`
- freeze the `EPIC-A -> EPIC-D` execution order
- finalize the fixture app baseline and non-go boundaries for the first `Apps` slice
- `Day 2`
- define the cross-surface uninstall evidence model for preview, completion, and history
- confirm restore-refresh expectations and acceptance criteria for `Apps`
- `Day 3`
- write the detailed implementation plan for the first `Apps` coding slice
- identify likely file-touch map and contract-test map
- `Day 4`
- define the next `Smart Clean` safe roots and the `review-only` vs `executable` boundary rules
- align roadmap, risks, and acceptance docs with the ordered epic sequence
- `Day 5`
- hold an internal doc gate for development readiness
- confirm the next coding session can begin with `EPIC-A` and without another sequencing pass
## Owner Tasks
- `Product Agent`
- keep parity work bounded to visible comparison pressure only
- reject backlog inflation that does not strengthen the frozen MVP
- `UX Agent`
- define visible trust cues for supported, unsupported, and review-only actions
- keep Atlas's UI difference legible against broader cleaner tools
- `Mac App Agent`
- identify concrete UI surfaces that must change in `Smart Clean`, `Apps`, `History`, and completion states
- `Core Agent`
- define the preview taxonomy and structured evidence that the UI can actually render
- `System Agent`
- define which additional safe cleanup classes are realistic next targets for `Smart Clean`
- `QA Agent`
- define the fixture set, comparison scenarios, and contract-style checks
- `Docs Agent`
- keep strategy, acceptance, roadmap, and release-check documents aligned
## Validation Plan
### Planning Validation
- every new task maps to existing MVP surfaces
- every new acceptance criterion is testable
- every parity goal has an explicit competitor reference and an explicit Atlas non-goal
### Readiness Validation
- at least one implementation-ready plan exists for the next coding slice
- acceptance matrix and beta checklist reflect the new competitive gates
- no document implies that Atlas is reopening deferred scope
## Exit Criteria
- selective parity work is expressed as tasks, acceptance, and validation rather than just strategy prose
- `Smart Clean` and `Apps` both have explicit competitor-driven targets
- next coding session can start on `EPIC-A` without another planning pass
## Known Blockers
- signed public beta remains blocked by missing Apple release credentials
- `Smart Clean` breadth still has to stay subordinate to execution honesty
- `Apps` depth work must remain bounded by what Atlas can safely prove and recover
- release readiness still cannot close the public-distribution gap until Apple signing materials exist