Files
CleanMM/Docs/Execution/Polish-Week-01.md
2026-03-10 17:09:35 +08:00

2.0 KiB

Polish Week 1 Plan

Goal

Establish a shared polish baseline and improve the two most trust-sensitive MVP flows: Smart Clean and Apps.

Must Deliver

  • MVP state audit covering default, loading, empty, partial-permission, success, and failure states
  • Shared polish baseline for spacing, card hierarchy, CTA priority, status tone, and destructive-action language
  • Smart Clean improvements for scan controls, preview readability, execution confidence, and result continuity
  • Apps improvements for uninstall preview clarity, leftover visibility, and recovery confidence
  • Narrow verification for first-run, scan, preview, execute, uninstall, and restore-adjacent flows

Day Plan

  • Day 1 Audit all frozen MVP routes and record the missing states and trust gaps
  • Day 2 Tighten shared design-system primitives and copy rules before page-specific tweaks
  • Day 3 Polish Smart Clean from scan initiation through preview and execute feedback
  • Day 4 Polish Apps from refresh through uninstall preview and completion messaging
  • Day 5 Run focused verification and hold a gate review for Week 2 polish work

Owner Tasks

  • Product Agent define the polish scorecard and keep work inside the frozen MVP scope
  • UX Agent close wording, hierarchy, and permission-guidance gaps in trust-critical surfaces
  • Mac App Agent implement design-system and feature-level refinements for Smart Clean and Apps
  • QA Agent verify the state matrix and catch visual or flow regressions in the primary paths
  • Docs Agent keep backlog, execution notes, and follow-up risks in sync with the week output

Exit Criteria

  • Smart Clean and Apps read clearly without requiring implementation knowledge
  • Primary CTAs are obvious, secondary actions are quieter, and destructive actions feel reversible
  • The top-level screens no longer fall back to generic empty or ambiguous progress states in core flows
  • Week 2 can focus on Overview, History, and Permissions without reopening Week 1 trust issues